420Docs context
Skip to content

CMP-2.3 Qualification Evidence

Step

  • Step: CMP-2.3 — Replaceable matching engine
  • Status: COMPLETE
  • Qualification: Level 1 + Level 2
  • Qualified implementation SHA: 103791e7c700ccd53607613b7d0cd2b6ab376902
  • PR: #490
  • Branch: cmp-2.1-worker-offers-20261002
  • PR common/base SHA: c3fbda60247e76f26a7e183069dd6782ed0da038
  • Current main observed at closeout: b58b09a17e641a42b81d832bad913a83c7caada9

CMP-2.3 is the first CMP-2 offers/requests/matching convergence milestone, so it is qualified at Level 1 and Level 2. Level 3 remains reserved for CMP-2.8 phase closeout.

Implemented surface

The qualified head introduces the authoritative ComputeMatch420 matching contract, focused matching tests, frozen CMP-2.3 configuration, design documentation, a mechanical verifier, retained workflow coverage, and roadmap integration.

Schedulers may propose compatible request/offer pairs without receiving execution or acceptance authority. Acceptance remains contract-authoritative and request-owner controlled. Proposal acceptance revalidates exact request/offer revisions, commitments, effectiveness, compatibility, and the at-most-one accepted match invariant. Accepted matches freeze reconstructable immutable request/offer identity and economic snapshots.

CMP-2.4 pricing expansion, CMP-2.5 atomic capacity reservation/consumption, CMP-2.6 scheduler service redundancy policy, CMP-2.7 full adversarial market qualification, and CMP-2.8 Level 3 closeout remain deliberately deferred.

Exact-head qualification

Compute Market Qualification #182

  • Run ID: 37087520276
  • Job: fast-qualification / 111100774053
  • Result: SUCCESS
  • Exact-head checkout: SUCCESS
  • Exact-head verification: SUCCESS
  • Compute Market build: SUCCESS
  • Retained Compute Market Solidity suite: SUCCESS
  • Result: 454 passed, 0 failed, 0 skipped across 69 suites
  • CMP-2.1 verifier: SUCCESS
  • CMP-2.2 verifier: SUCCESS
  • CMP-2.3 verifier: PASS
  • Affected @420/sdk Compute build/test: SUCCESS

Solidity Contracts #4407

  • Run ID: 37087520333
  • Classifier job: 111100774276 — SUCCESS
  • compute-fast job: 111100792662 — SUCCESS
  • Exact-head checkout: SUCCESS
  • Exact-head verification: SUCCESS
  • Compute Market build: SUCCESS
  • Retained Compute Market Solidity suite: SUCCESS
  • Full foundry inventory: SKIPPED by intended compute-only classification
  • PR shards: SKIPPED by intended compute-only classification

No Level 3 full-repository qualification was launched for CMP-2.3.

Exit-criterion reconciliation

Exit criterion Evidence Status
two independent schedulers can propose the same eligible pair without gaining authority focused ComputeMatchingEngine420Test coverage + retained suite green PASS
contract revalidates all implemented request/offer compatibility constraints ComputeMatch420.proposalEligible / acceptance revalidation + mechanical verifier PASS
stale request or offer revision invalidates a proposal focused request-revision and offer-revision tests PASS
resource/offer drift invalidates a proposal focused resource-drift test PASS
only the request owner can accept in CMP-2.3 focused scheduler/non-owner rejection coverage PASS
a request can be accepted at most once focused competing-proposal acceptance test PASS
accepted match freezes reconstructable request/offer commitments and identities immutable accepted snapshot assertions PASS
failed proposal/acceptance is atomic focused incompatible-price and failed-acceptance atomicity coverage PASS
retained offers/requests/matching integration passes at Level 2 Compute Market #182 and Solidity #4407 compute-fast both green on exact head PASS

All original frozen CMP-2.3 exit criteria are satisfied on the qualified implementation SHA.

Qualification incident resolved before final pass

The prior implementation head 7478896fd5c0ea42638c1cd245d5a47a24009ee7 failed both retained suites solely because the new test fixture consumed vm.prank(OPERATOR) on a preceding external constant getter before calling resources.register(...). The registry correctly reverted UnauthorizedOperator(). The fixture was corrected without weakening authorization or matching semantics, producing the final qualified implementation head 103791e7c700ccd53607613b7d0cd2b6ab376902.

Deferred work

  • CMP-2.4 — Pricing model
  • CMP-2.5 — Capacity-aware assignment
  • CMP-2.6 — Scheduler redundancy and non-authority
  • CMP-2.7 — Market adversarial qualification
  • CMP-2.8 — Phase closeout / Level 3

Conclusion

CMP-2.3 is COMPLETE at Level 1 + Level 2 against exact implementation SHA 103791e7c700ccd53607613b7d0cd2b6ab376902.

The next canonical roadmap step is CMP-2.4 — Pricing model.