CMP-2.5 — Qualification evidence¶
Status: COMPLETE — Level 1 exact-head qualified.
Scope¶
Canonical roadmap step: CMP-2.5 — Capacity-aware assignment
Canonical requirement: Consume CMP-1.3 capacity reservations atomically.
Qualification level: Level 1. No new Level 2 milestone is required for CMP-2.5; Level 3 remains deferred to CMP-2.8 phase closeout.
Exact implementation SHA¶
61e40c8928138bd3b6676df0dfbe46dac4dc9e0b
Branch: cmp-2.1-worker-offers-20261002
PR: #490
Main observed at closeout: 1b9330871f7e9d0e79014955a61599baf70134fa
Qualification runs¶
Compute Market Qualification #198¶
Run ID: 37173532429
Job: fast-qualification — job ID 111351281315
Result: SUCCESS
Exact-head checkout was explicitly verified against 61e40c8928138bd3b6676df0dfbe46dac4dc9e0b.
Retained Compute Market Solidity suite:
- 70 suites
- 463 tests passed
- 0 failed
- 0 skipped
- CMP-2.5 targeted tests included and passed
Mechanical verification:
- CMP-2.3 verifier: PASS
- CMP-2.4 verifier: PASS
- CMP-2.5 verifier: PASS
SDK qualification:
- 24 tests passed
- 0 failed
- TypeScript build passed
Solidity Contracts #4591¶
Run ID: 37173532457
Classification job: 111351281404 — SUCCESS
Compute-fast job: 111351305550 — SUCCESS
Retained Compute Market Solidity suite:
- 70 suites
- 463 tests passed
- 0 failed
- 0 skipped
Full Foundry and PR-shard jobs were skipped as intended for this Level 1 app-scoped qualification.
CMP-2.5 exit criteria¶
- accepted CMP-2 market matches can be linked into the canonical JobRegistry flow;
- CMP-2 request evidence is exposed through an exact JobRegistry-compatible read-only proof;
- WorkerSnapshot remains the sole controller of CMP-1.3 capacity reservations;
- worker assignment consumes capacity through the existing atomic reserve -> assignment transaction boundary;
- capacity exhaustion reverts without leaving partial assignment or stranded reservation state;
- direct scheduler capacity mutation is rejected;
- stale resource revision / eligibility drift blocks assignment before capacity mutation;
- schedulers remain proposal-only and do not gain custody, reservation, or assignment authority;
- exact-head retained regressions, CMP verifiers, and SDK tests pass.
Qualification disposition¶
CMP-2.5 COMPLETE.
No Level 2 run is required for this ordinary roadmap step. Full phase-level Level 3 reconciliation and qualification remain deferred to CMP-2.8 — Phase closeout.
Next canonical roadmap step: CMP-2.6 — Scheduler redundancy and non-authority.