420Docs context
Skip to content

CMP S-10 — Operational soak, CMP-9 and CMP-10 handoff: qualification evidence

Status: offline Level 1 PASS; actual operational soak and security campaign NOT COMPLETE (NO-GO).

  • Canonical S-10 step and exit: auditable go/no-go with known blocker list; live sustained ingest, recovery/finality, key rotation, CMP-9/10 readiness must be separately evidenced.
  • Qualified implementation SHA: cbcd6654cea9f0fe2bc50ef0b39669d01589f662; branch cmp-s10-operations-handoff-20261008; stacked PR #584 based on S-09 evidence commit 106809d9bb9aab2c52b1bf99bdcdbbf18b8d98f6; inspected main reference ffc6a4028676907c266714b5c1ae8ba3af9a7137.
  • Implementation files: compute/ingestion/src/soak.mjs, compute/ingestion/test/soak.test.mjs, compute/ingestion/package.json, .github/workflows/cmp-s10-handoff.yml, docs/compute-market/CMP-S10-OPERATIONS-HANDOFF.md.
  • Required CMP S-10 Operational Handoff run 37862605328: SUCCESS at exact SHA, job 113601646201 SUCCESS, checks: exact checkout, Node 22 syntax, target S-10 and retained S-02–S-09 regression tests using npm run qualify.
  • Tests assert fixture-only environments cannot qualify a soak; an unqualified S-09, missing independent review or blocked operational gate returns NO-GO; missing/duplicate checks and unsupported evidence claims fail closed; a complete BLOCKED list remains auditable.
  • Actual operational outcome: NO-GO. External provider source approval, production-safe S-02 transport, real accepted-work proof, provider identity binding, durable Indexer, funded CMP-6/Vault claims, independent S-09 Level 2 two-provider payout evidence, live fault/reorg/restart/backfill, key rotation, recovery and budget-exhaustion drills, source consent and signed on-chain finality are outstanding. CMP-9.13/9.14/9.15 and CMP-10 campaign evidence is not present.
  • Level 2 S-09 live milestone and S-10 operational checks deferred to actual testnet; Level 3 full accumulated merge-candidate qualification deferred. Do not merge the stack or claim production deployment as a result of this check.
  • Next: canonical CMP-9.13 scientific demonstration / CMP-9.14 soak / CMP-9.15 operational closeout and CMP-10 security qualification on a functioning testnet, followed by exact-SHA Level 3 when phase closure is requested.

Evidence-only commit uses inherited qualified implementation SHA; no new executable qualification is required.